Projects

Recent passive fire protection work across logistics, commercial and fabricated steel packages, delivered with coating control and QA records.

Structural steel frame on a construction project

Logistics

Distribution Centre Steel Frame

Spray-applied intumescent coating to primary and secondary steelwork with recorded DFT checks and phased handover.

Steel canopy frame structure

Steel fabrication

Fabricator Off-Site Programme

Controlled-environment coating programme for fabricated steel packages, supporting faster site installation and consistent finish quality.

Industrial steel structure detail

Commercial

Commercial Development Core

Passive fire protection works coordinated with the main contractor’s programme, including QA records and DFT reporting.

Vertex Fire Protection

Specialist passive fire protection contractor delivering intumescent steel coatings, fire-rated timber coatings and DFT-tested quality assurance across the UK.

© 2026 Vertex Fire Protection. Passive fire protection contractor.

Nationwide UK coverage